ESTIMATE FOR

SUBMIFIED BY

Appendix C

Combined

128

ON THE

DAY OF

187

ART OF TILDING.

DESCRIPTION OF WORK,

No.

L. B.

D.

CONTENT.

RATE.

AMOUNT.

rought forward & 373. 71

sking Hydraulic line

10.084 2.l

208.4

dway

Concreto

10.06.0

0.

Ꮧ.

2.0 120.0

10.027.01.0

10.0 3.0

15.0

270..

0

6

+

613.4

2.2.12

you 2.00

45.40

amel. 6in: fine quncher.

granite bedded &

jointed in Porstand

Cement.

V

10.0 3.0

30.0

15.00

ital cost for 10 feet of wall and roadwaych

434.11

May

Note: The prices 60 and 40 cents per cubic foot of Masonry land in Portland Cement Mastan be reduced respectively to 52 and 40 cents per Cubre foot if the tamle masonry be laid

Chinese stone lime mortar with Portland Cement Morlan

3 inches inward from the Edge by the Stones.